Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

Site is pretty clean now but still no trace of crane.

DSC04631.JPG


DSC04632.JPG


DSC04634.JPG


 
As per Tribute's IG story, the crane installation is anticipated to be "coming soon":



Screenshot_20220628-195412_Instagram.jpg
 
  • Like
Reactions: PMT
I was wondering when this will happened. I was caught off guard when I walked passed this weekend and saw the crane finally installed. 🙌🏽
Glad to see that they have the crane finally installed. The parking lot took very long to dig out (limited working space) But atleast there is progress!!!
 
Still trying to get to the bottom:


View attachment 451280
Something must have happen for this tower not to be at grade right now! But it looks like they're going down about six storeys in the middle of the pit. just by counting the staircase scaffolds seen in the photos up above! That pretty deep to put in a 250 to 300m tower in lol!
 


2161 YONGE ST
Ward 12: Toronto-St. Paul's

Application Number: 23 115845 STE 12 MV
Application Type: Minor Variance
Date Submitted: 21/02/2023
Status: Accepted

Description:
Proposal to increase the building height to 123.6m and 38-storeys; increase the total maximum GFA to 31,691m2; increase the total residential GFA to 23, 156m2 and reduce the minimum length of 26 parking spaces from 5.6m to 5.3m/5.1m of a proposed new 35 storey mixed use building.
 
The new info updated and taken from the minor variance. The total storey changed from 35 storeys to 38 storeys. Total height changed from 121.30m to 130.70m. The total unit count changed from 304 units to 335 units. Finally, the total parking space was reduced from 155 parking to 150 parking.
 