As I remember it, these billboards were grandfathered as new billboards wouldn't be allowed. They would have had to maintain part of the building's structure to keep them up. I'm sure it was a consideration until surrounding development blocked the panoramic views of the billboards and the lighting would probably face new restrictions. Y'know, the whole Kenny Roger's Chicken situation.
 
latest
 
Excavation for West Block is continuing - and an interesting detail has emerged. In the south west section of the site, the shoring, and now the excavation does not extend all the way to Lake Shore Blvd - there is a series of large concrete piers running in a diagonal from Bathurst Street, just north of Lake Shore Bvld, to the Lake Shore Blvd edge of the property, near the east lot line and the Panorama building. The shoring piles and excavation start just to the north of the concrete piers.

While the perimeter of the reconstructed building will extend to the corner of Bathurst and Lake Shore, the basement will not - the southwest corner of the building will require its own separate foundation section.

It turns out the concrete piers straddle, and protect the culvert containing the remnants of Garrison Creek, as it flows to the waterfront. The concrete piers have to remain in place, with the new building being constructed around them. The following photo shows the piers as they angle towards Lake Shore Blvd, along with the laneway beside the angled building south of Lake Shore Blvd, under which Garrison Creek flows, until it reaches the waterfront by the tree shown in the photo. The photo is from my cell phone - please excuse the poor resolution.

Westblock - Garrison Creek.jpg
 

Attachments

  • Westblock - Garrison Creek.jpg
    Westblock - Garrison Creek.jpg
    437.6 KB · Views: 1,867
Last edited:
It turns out the concrete piers straddle, and protect the culvert containing the remnants of Garrison Creek, as it flows to the waterfront.
I noticed this detail in the architectural plans and was curious about what ran through that culvert. Thanks for the info -- very interesting.

Here are the plans (P3 level):
Screen Shot 2016-10-20 at 12.31.04 PM.png


The Gardiner is directly north of the excavated area. It's a surprisingly tight site. Level P1, which extends north from here, is going to have some massive columns supporting the Gardiner above.
 

Attachments

  • Screen Shot 2016-10-20 at 12.31.04 PM.png
    Screen Shot 2016-10-20 at 12.31.04 PM.png
    220.1 KB · Views: 1,684
They aren't building any new columns to support the Gardiner. The existing large circular ones are staying in place and they are excavating around them.

You can see them in the drawings on the city site dated Sept 2016.
 
Oct 10.
Just got around to fixing and uploading the photos of the site I shot some weeks ago. There about 100 shots up on site now.

A lot more of the old dock system found.
30562525145_768b2ab539_h.jpg

30445942492_a9138a3295_h.jpg

30562441435_a8df590906_h.jpg

30445904742_81845a4379_h.jpg

30445797762_018a3c6790_h.jpg

29931680254_740c1a3a1e_h.jpg

29929135013_fb2c56038e_h.jpg

30526763226_9b6416f93a_h.jpg

30562588045_34cab9d431_h.jpg
 
Priestly Demolition has released a new video of the demolition process. Quite the informative clip with interviews, narration, etc.

 
Last edited:
Drum has just posted some shots to his Flickr account (linked at the bottom of his post above) which are five weeks newer than the last ones he's posted above. (Maybe he'll get time to post them here soon too?)