nfitz
Superstar
I think might've replied to the wrong post. I wasn't referring to lighting or the floor finish. Or future fast food.We have been through this before. The City has said that the Great Hall lighting will be replaced in 2022 and they will also finish repairing the floor. The fixing up of the proposed restaurant on the north side is a matter for Osmington - the 'head leasee' - I assume it is currently not easy to rent out the space.
I think the great hall has always looked fantastic, as it does in that (older) photo - which doesn't show the floor! I can only assume it will look slightly better once (if!) the reno is all done. I can't wait to see what the east wing looks like as a public space!