Not calling anyone here a liar, but I'm as well having a hard believing the new concourse will be opening in a couple weeks.

Seems like there is still so much work to do.
 
At the beginning of the year they were projecting October/November. I haven't heard an update since then.

Dan
Toronto, Ont.

If this is related to the part in the York St underpass where they are gradually uncovering the windows, there is a lot of cleanup to do.
 
Have there been any hardhat tours of the York concourse? I wonder if they're going to open it unfinished like they did the new TTC Union concourse. I'm also curious how transfers to the TTC will work, since the lower concourse clearly won't be functional (can't be, since it would be lower than the existing moat and they can't excavate the west end of the moat until the east end is reopened)
 
Have there been any hardhat tours of the York concourse? I wonder if they're going to open it unfinished like they did the new TTC Union concourse. I'm also curious how transfers to the TTC will work, since the lower concourse clearly won't be functional (can't be, since it would be lower than the existing moat and they can't excavate the west end of the moat until the east end is reopened)

I would imagine it would be largely complete when the open it. The TTC concourse had to be opened incomplete because the former concourse area needed to be ripped out in order to accommodate construction of the 2nd platform. They didn't really have a choice, because the subway needed a connection between it and Union.

With GO on the other hand, they have a perfectly usable concourse space that has been more or less unaffected by construction to date. They've done a very good job of minimizing the visual aspects of construction thus far, so I don't see why they would suddenly throw thousands of passengers into what would still be largely a construction site if they've gone to such great lengths to avoid that to this point.
 
I presume tranfers will be very awkward for a while and very "clogged up" as they would have to walk through the passage under the great hall entrance.
 
Application: Building Additions/Alterations Status: Not Started

Location: 61 FRONT ST W
TORONTO M5J 1E5

Ward 28: Toronto Centre-Rosedale

Application#: 13 252334 BLD 00 BA Accepted Date: Oct 17, 2013

Project: Transit Station,Subway, Bus Terminal Interior Alterations

Description: Proposal for interior alterations to office space (new tourist information kiosk) on the concourse level (unit G-W403) of existing Union Station.
 
IMG_20131019_115230.jpg


IMG_20131019_113904.jpg


IMG_20131019_113925.jpg


IMG_20131019_113939.jpg



IMG_20131019_114024.jpg



IMG_20131019_114028.jpg



IMG_20131019_114106.jpg



IMG_20131019_114110.jpg




IMG_20131019_114114.jpg




IMG_20131019_114140.jpg



IMG_20131019_114145.jpg



IMG_20131019_114203.jpg




IMG_20131019_114210.jpg




IMG_20131019_114236.jpg




IMG_20131019_114257.jpg



IMG_20131019_114820.jpg



IMG_20131019_114847.jpg


from a dirty window inside the skywalk
IMG_20131019_115530.jpg
 

Attachments

  • IMG_20131019_115230.jpg
    IMG_20131019_115230.jpg
    87.9 KB · Views: 1,352
  • IMG_20131019_115530.jpg
    IMG_20131019_115530.jpg
    91.7 KB · Views: 1,330
  • IMG_20131019_113904.jpg
    IMG_20131019_113904.jpg
    86.9 KB · Views: 1,334
  • IMG_20131019_113925.jpg
    IMG_20131019_113925.jpg
    95.7 KB · Views: 1,339
  • IMG_20131019_113939.jpg
    IMG_20131019_113939.jpg
    95.4 KB · Views: 1,327
  • IMG_20131019_114024.jpg
    IMG_20131019_114024.jpg
    97.9 KB · Views: 1,329
  • IMG_20131019_114028.jpg
    IMG_20131019_114028.jpg
    97.6 KB · Views: 1,341
  • IMG_20131019_114106.jpg
    IMG_20131019_114106.jpg
    97.6 KB · Views: 1,327
  • IMG_20131019_114110.jpg
    IMG_20131019_114110.jpg
    97.7 KB · Views: 1,325
  • IMG_20131019_114114.jpg
    IMG_20131019_114114.jpg
    99.3 KB · Views: 1,307
  • IMG_20131019_114140.jpg
    IMG_20131019_114140.jpg
    97.2 KB · Views: 1,338
  • IMG_20131019_114145.jpg
    IMG_20131019_114145.jpg
    93.3 KB · Views: 1,317
  • IMG_20131019_114203.jpg
    IMG_20131019_114203.jpg
    97.9 KB · Views: 1,307
  • IMG_20131019_114210.jpg
    IMG_20131019_114210.jpg
    96.5 KB · Views: 1,326
  • IMG_20131019_114236.jpg
    IMG_20131019_114236.jpg
    91 KB · Views: 1,305
  • IMG_20131019_114257.jpg
    IMG_20131019_114257.jpg
    93.5 KB · Views: 1,297
  • IMG_20131019_114820.jpg
    IMG_20131019_114820.jpg
    92.4 KB · Views: 1,312
  • IMG_20131019_114847.jpg
    IMG_20131019_114847.jpg
    93 KB · Views: 1,307
They have started to put in the rebar for the concourse floor. the stairs on the far eastern side of Union facing Bay were poured last week.
 

Back
Top