As far as I can see, the area behind it contains additional doors to the west Front Moat area and I assume these will be opened up in due course. Question: Will they also be relocating the Security Office (it looks a bit temporary to me!)?
^Pretty sure that's going to be retail space behind it. All of the doors to the west Front Moat area have been opened already (... unless that one that Amano had blocked off with additional temporary signage is still blocked.... can't recall)
 
Has anyone mentioned that the east corridor of the VIA Concourse has re-opened? The side channel that leads to the so-called Arrivals area, a.k.a. the Front St Promenade.

Also of note is the re-appearance of a water fountain in the VIA Concourse, near the gents' loo.
 
Dec 28
49334713223_e18407cfe0_b.jpg

49334635768_48161cb1ab_b.jpg

49335103246_79e15e8473_b.jpg

49335103681_cdc83e6c45_b.jpg

49335104296_ac7c0fa545_b.jpg

49335105071_3d741fae3c_b.jpg

49335320792_6030a840e1_b.jpg

49335321157_ab0bf85b10_b.jpg


2 sets of escalators on both sides of the stair
49334639043_0c36348378_b.jpg

49334639633_bb756402d1_b.jpg

49335322467_c96f571a43_b.jpg

49334640298_9b90fc69d5_b.jpg

49335323072_2e6e062014_b.jpg

49335107911_eebdc54b18_b.jpg

49335323807_e920143c43_b.jpg

49335324132_61a8d8d44e_b.jpg

49335109001_3d49a62515_b.jpg

49334643088_2f54dd71df_b.jpg

49334643473_2f8814e15b_b.jpg

49334643933_98e853d069_b.jpg

49334644293_8cdcf1dca5_b.jpg


Both Bay and York will have 2 sets of double doors for each opening
49334645308_35a1426acc_b.jpg

49334645638_7ea033f300_b.jpg

49335113106_9b40dd836b_b.jpg
 
While passing through Union earlier I noticed they are working in and around the Leather Shop Bypass. They are putting stone up on the pillars and working on the bypass itself. Work was also taking place in the former arcade space as far as I could tell but I could tell specifically what was being worked on.

Something tells me the leather shop bypass will be opened soon.

Lastly, the Tims Kiosk is finally gone. It looks so much better without it there. Here's to hoping they can get rid of that god awful promo booth next to Wvrst and the security office.
 
While passing through Union earlier I noticed they are working in and around the Leather Shop Bypass. They are putting stone up on the pillars and working on the bypass itself. Work was also taking place in the former arcade space as far as I could tell but I could tell specifically what was being worked on.

Something tells me the leather shop bypass will be opened soon.

Lastly, the Tims Kiosk is finally gone. It looks so much better without it there. Here's to hoping they can get rid of that god awful promo booth next to Wvrst and the security office.
The promo booth is probably the most profitable (on a per sq ft basis) tenant when it's in use.
 
You know what blocks pedestrian flows more than that promo booth. People standing slack jawed in the middle of the concourse staring blankly at the departure boards. MOVE TO THE SIDE PLEASE!

They should mark part of the floor along two axes (along with the area right in front of platform entrances leading to them) as "no standing zones". Fat yellow zebra stripes will do.

AoD
 
They should mark part of the floor along two axes (along with the area right in front of platform entrances leading to them) as "no standing zones". Fat yellow zebra stripes will do.

AoD

Or put the display screens along the walls so people are standing off to the side instead of in the middle of the concourse.
 
Or put the display screens along the walls so people are standing off to the side instead of in the middle of the concourse.

Or that, though I have my doubts about how quickly GO goes about anything involving rewiring (case in point - Presto readers in the teamways) - nevermind their general lack of sense when it comes to electronic signage. Marking on the floor takes no time.

AoD
 
Or that, though I have my doubts about how quickly GO goes about anything involving rewiring (case in point - Presto readers in the teamways) - nevermind their general lack of sense when it comes to electronic signage. Marking on the floor takes no time.

AoD

I have a bone to pick with the placement of the Presto Readers. They are spaced out evenly in the Teamways.

However the problem is most people use the first Presto Reader when they enter the teamway causing a long queue and then they have to cross the crowds to go catch their trains on the other side.

It would make sense to have 2 or 3 presto readers installed at the entrance and place them in a way so people dont have to cross the crowds to catch their trains.
 
I have a bone to pick with the placement of the Presto Readers. They are spaced out evenly in the Teamways.

However the problem is most people use the first Presto Reader when they enter the teamway causing a long queue and then they have to cross the crowds to go catch their trains on the other side.

It would make sense to have 2 or 3 presto readers installed at the entrance and place them in a way so people dont have to cross the crowds to catch their trains.

You'd think - but that seemingly never occurred to them. Hence my utter lack of confidence in their competence on such matters (I mean, they are still functioning on the belief that not showing platform information as a way to keep passengers down in the concourse/teamway).

AoD
 