Richard White
Senior Member
Scaffolding being removed on 2 fronts: a) eastern facade (Bay St side), and b) eastern side of Great Hall atrium.
The real fun comes when they work on the ceiling in the centre of the Great Hall....
Scaffolding being removed on 2 fronts: a) eastern facade (Bay St side), and b) eastern side of Great Hall atrium.
If only the reflections always were aimed at shade.I really like it actually since the area is almost never in shade. It is pleasantly sunny for almost the entire day.
That map is effective yesterday (Dec 19) as that is when the latest platform changes took place.any idea when that map came out? just the other day I noticed the porter shuttle had returned to its original place on the York Street side of Royal York.....yet on this map it is shown south of front street.
It moved back recently but I am not sure it is staying at Royal York west doors as the City are about to widen the sidewalks on York Street (and have done so in an interim way from Wellington to just north of Royal York.) Nothing stays in one place for long at Union so maps are always going to playing catch-up.any idea when that map came out? just the other day I noticed the porter shuttle had returned to its original place on the York Street side of Royal York.....yet on this map it is shown south of front street.
any idea when that map came out? just the other day I noticed the porter shuttle had returned to its original place on the York Street side of Royal York.....yet on this map it is shown south of front street.
I noticed just before the snow that the excavated moat area on the Bay side is getting prepared to pour the (final?) concrete and the same area on the York side has the huge new drainage pipes all installed and also looking almost ready to get the (final?) layer of concrete. I assume both will be done when the weather warms up....
The Bay Concourse passage is still open with no sign of it being closed soon.Speaking of which have they closed the route through the former Bay Concourse? Have not been through Union in a couple weeks but this map only shows the entrance via the leather shop bypass and at the York Concourse. I would not be surprised but am curious.
Also does anyone know the status of the lower level York Concourse?
I noticed just before the snow that the excavated moat area on the Bay side is getting prepared to pour the (final?) concrete and the same area on the York side has the huge new drainage pipes all installed and also looking almost ready to get the (final?) layer of concrete. I assume both will be done when the weather warms up....
Noticed along front street this morning outside Union a flatbed delivery truck with what looked like the glass panels for the Bay and York Street moats. Perhaps these panels are for another project, but it looked promising!
As AofD says this is very unlikely. More likely is glass for the internal skylight on the east wing - you can (sometimes) see this by looking through the doors at east end of Great Hall). A few weeks ago Front Street was closed while they lifted the new beams for it into the courtyard area.Noticed along front street this morning outside Union a flatbed delivery truck with what looked like the glass panels for the Bay and York Street moats. Perhaps these panels are for another project, but it looked promising!
Sorry, no. They had earlier put down the usual gravel and most recently what looked like a waterproof membrane. Frankly not terribly exciting! If anyone wants to photograph it I suspect no concrete will be poured on top of it or a few months.Sounds like an exciting milestone. Did you get any pics by chance? It would be nice to see before and after the pour.