Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

Today.
IMG_6542.jpeg
IMG_6543.jpeg
IMG_6544.jpeg
IMG_6545.jpeg
IMG_6546.jpeg
IMG_6547.jpeg
IMG_6548.jpeg
IMG_6549.jpeg
IMG_6550.jpeg
IMG_6551.jpeg
 
Photos taken today, Friday (Aug. 25). Since my last post last Friday, windows completed for the 8th floor on the east and north side under the Rail Climbing Systems (RCS), with cladding also partly installed - complete on the east side, partly on the north side. The windows/cladding on the west side not yet placed, presumably as it needs to be coordinated with the west extension's cladding. And... the work site has pushed into Bloor Street, presumably to allow installation of a new sidewalk.

Photos: Starting with my weekly "time-lapse" photo, added to the album of the same name on Flickr showing progress from Oct 2020. Then, the progress of the window/cladding 8th-floor installation on the east (complete) and north side (partially done). With the tower on floor 37, I believe, working on the second mechanical levels, and the scaffolds now risen above the bottom of the latest corner hangers with netting now moved above those hanger levels, some wide shots and close-ups from Bloor by Holt Renfrew; from Cumberland east of Bay; from Yonge Street by the mall entrance north of Bloor. Finally, shots of the new placement of the site barriers into Bloor Street, the public sidewalk now over the Bloor bike path.


UTIMG_1107.jpg
UTIMG_1149.jpg
UTIMG_1366.jpg
UTIMG_1421.jpg
UTIMG_1185.jpg
UTIMG_1210.jpg
UTIMG_1237.jpg
UTIMG_1275.jpg
UTIMG_1304.jpg
UTIMG_1330.jpg
UTIMG_1380.jpg
UTIMG_1438.jpg
 
Last edited:

Back
Top