The G&M Centre is going up very fast now, advancing about a floor every 8 to 10 days. Currently at the 7th floor at King Street, and 6th floor at Front Street. The building is now about a third of the way to the top (17 storeys + mechanical penthouse). At this pace, I anticipate the building will be topped off by early October.