Toronto Sun Life Financial Tower & Harbour Plaza Residences | 236.51m | 67s | Menkes | Sweeny &Co

One of the cranes is coming down today. Not sure if it's being removed or relocated elsewhere on site.
 
IMG_4821.jpg


IMG_4822.jpg


IMG_4823.jpg


IMG_4824.jpg


42
 

Attachments

  • IMG_4821.jpg
    IMG_4821.jpg
    87.4 KB · Views: 1,397
  • IMG_4822.jpg
    IMG_4822.jpg
    94.7 KB · Views: 1,288
  • IMG_4823.jpg
    IMG_4823.jpg
    96.6 KB · Views: 1,306
  • IMG_4824.jpg
    IMG_4824.jpg
    92.8 KB · Views: 1,305
hmm, one interesting point re: that. On Menkes own website, harbour plaza is only under the 'coming soon' section, not 'under construction':
http://www.menkes.com/condominium-living/coming-soon

Not sure how much to read into that. Other sources say it is under construction (e.g. buzz buzz homes).
 
The original middle crane has now gone, and a new luffing crane is being assembled on the office tower section.
 
hmm, one interesting point re: that. On Menkes own website, harbour plaza is only under the 'coming soon' section, not 'under construction':
http://www.menkes.com/condominium-living/coming-soon

Not sure how much to read into that. Other sources say it is under construction (e.g. buzz buzz homes).
I wouldn't read much, they also have Fabrik as being in preconstruction.
 
Just now:

hmm - all the posts said a crane was coming down, but these photos show a yellow crane being assembled as the previous cranes were all white. So it doesnt appear a crane was lost, just a replacement likely because the previous one was where the RBC Path connection is.
 
Coming Summer 2016? That's a bit ambitious, isn't it?

This should be topped off by Spring 2015, so opening in 2016 should be no trouble at all.

42
 

Back
Top