The supplier isn't changing anything at this point. The lead time on fabrication is huge, especially for Trump considering the frames are coming in from China. I'd imagine the entire building has already been fabricated and is either in transit or is sitting down at the yard (the yard is somewhere in the port lands, off of Cherry, I think)
It's not like it's a huge deal to change those two windows, either. It'll get fixed sooner or later. As far as fuckups go that one is so minor that it wouldn't even account for a blip in installation. Even if they realized the glass was wrong on the frame they would've still had to install it because of the way everything interlocks. It's not like they would just shut down the job and send everyone home for two weeks while they wait for the replacement glass.
Of course not. But we've had a several week blip in installation. Any theory as to why?