Sorry if this has been addressed already but is there a reason why the east section is prioritized over the west?
I'm with others that the whole thing should be done at the same time. Would likely save cost and inconvenience/construction mess... not to mention that the whole thing would then be available sooner which is sort of the point.
Happy to see the relief line's become a more legit' part of the transit conversation though.
I'm with others that the whole thing should be done at the same time. Would likely save cost and inconvenience/construction mess... not to mention that the whole thing would then be available sooner which is sort of the point.