crs1026
Superstar
When the Niagara Tunnel was constructed, subsurface rights had to be obtained from a variety of parties
See sections 3.3 and 3.4 of http://www.opg.com/about/regulatory-affairs/Documents/2014-2015/D1-02-01_Att 2_Project Execution Plan R00.pdf for some documentation
EDIT: PS - I can't resist pointing out the difference in the degree of transparency between OPG and Metrolinx. Would ML ever put this amount of information about their projects online for the public to read? Not in a million years. Kudos to OPG.
- Paul
See sections 3.3 and 3.4 of http://www.opg.com/about/regulatory-affairs/Documents/2014-2015/D1-02-01_Att 2_Project Execution Plan R00.pdf for some documentation
EDIT: PS - I can't resist pointing out the difference in the degree of transparency between OPG and Metrolinx. Would ML ever put this amount of information about their projects online for the public to read? Not in a million years. Kudos to OPG.
- Paul