I'm just jumping into this thread and I'm curious if there's been any indication to what will happen with the other bank building that isn't a part of this complex.
 
I'm curious if there's been any indication to what will happen with the other bank building that isn't a part of this complex.

Didnt some one say a while ago, that that irish guy that owns it was into selling it for approx. 19 million, ??
Lots of dough to pay for a structure, with little to no space for development expansion
 
It would seem like things are looking quite neat and tidy at the bottom of the Massey Tower excavation now, but it's still a work in progress on the Massey Hall side of things on Victoria. So, starting with the view from just off Yonge…

1DSC05479.jpg
2DSC05484.jpg
3DSC05482.jpg
4DSC05483.jpg
5DSC05489.jpg
DSC05486.jpg


It can't be too long before we see the crane here, can it?! I don't see the obvious spot for it yet though…

42
 

Attachments

  • 1DSC05479.jpg
    1DSC05479.jpg
    353.1 KB · Views: 2,771
  • 2DSC05484.jpg
    2DSC05484.jpg
    362.8 KB · Views: 2,740
  • 3DSC05482.jpg
    3DSC05482.jpg
    588.9 KB · Views: 2,705
  • 4DSC05483.jpg
    4DSC05483.jpg
    449.6 KB · Views: 2,720
  • 5DSC05489.jpg
    5DSC05489.jpg
    486.3 KB · Views: 2,726
  • DSC05486.jpg
    DSC05486.jpg
    367.8 KB · Views: 2,690
Massey Tower is a raft slab and once poured and complete I believe will then be the location of the crane. They cannot install the crane on the Hall side until the tower crane is operational on the Tower side given the proximity of both sites. Looking at the Hall side the only remaining material on site is there for access to get to the Tower. Once the crane is up for the Tower its should move pretty quick.

Im assuming the site will be quiet for a few weeks once TIFF gets going.
 
I believe so but they would all be formed off the raft slab once poured. I am expecting a fair amount of steel will start to be laid and tied now. (Similar to how CASA III is looking right now.)
 
Sept 3
Tower crane could be going up this week or next if the concrete was pour last week for the tower base, as it is ready for it.
21215525322_8d333423b6_b.jpg

21037860750_cd72f054e9_b.jpg

21215553842_836124c7d3_b.jpg

21037875800_a21956de1c_b.jpg

21038091458_34c299da18_b.jpg

21199753006_ab05df7aa5_b.jpg

21199750906_7e6419e628_b.jpg

21039166359_2908b28d96_b.jpg
 
The construction staging area for this project went forward today at TEYCC. Looking at more than 4 years of closure of the east northbound lane on Yonge. Its interesting to note the cost of the staging area as fees were increased back in May. MOD will be paying about 1.25 million for both this closure and the smaller closer on Victoria St.
 
Stopped by this morning on my wander down Yonge Street. Really interested in the engineering behind this project.

MasseyTower-Sep18-15B.jpg

MasseyTower-Sep18-15C.jpg
MasseyTower-Sep18-15D.jpg
MasseyTower-Sep18-15E.jpg
MasseyTower-Sep18-15F.jpg
MasseyTower-Sep18-15G.jpg
MasseyTower-Sep18-15H.jpg
MasseyTower-Sep18-15I.jpg
MasseyTower-Sep18-15J.jpg
MasseyTower-Sep18-15K.jpg
 

Attachments

  • MasseyTower-Sep18-15B.jpg
    MasseyTower-Sep18-15B.jpg
    863.6 KB · Views: 1,008
  • MasseyTower-Sep18-15C.jpg
    MasseyTower-Sep18-15C.jpg
    1.3 MB · Views: 997
  • MasseyTower-Sep18-15D.jpg
    MasseyTower-Sep18-15D.jpg
    882.1 KB · Views: 986
  • MasseyTower-Sep18-15E.jpg
    MasseyTower-Sep18-15E.jpg
    1.1 MB · Views: 979
  • MasseyTower-Sep18-15F.jpg
    MasseyTower-Sep18-15F.jpg
    578.4 KB · Views: 983
  • MasseyTower-Sep18-15G.jpg
    MasseyTower-Sep18-15G.jpg
    650.8 KB · Views: 986
  • MasseyTower-Sep18-15H.jpg
    MasseyTower-Sep18-15H.jpg
    1 MB · Views: 1,009
  • MasseyTower-Sep18-15I.jpg
    MasseyTower-Sep18-15I.jpg
    567.9 KB · Views: 986
  • MasseyTower-Sep18-15J.jpg
    MasseyTower-Sep18-15J.jpg
    940.4 KB · Views: 970
  • MasseyTower-Sep18-15K.jpg
    MasseyTower-Sep18-15K.jpg
    985.9 KB · Views: 1,538
Last edited by a moderator:
Lovely pictures. I had to make them larger because this type of construction is not something you see everyday. Are they doing it this way because they are at bedrock? @Lenser
 