Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

July 07
The Don Roadway

No idea how thick the concrete base is as well how deep they went considering the area was still at grade when I last saw it
53844785106_4b70651bf1_b.jpg

53845050543_0f354c71e8_b.jpg

53845145249_2eab559b7e_b.jpg

53845145239_11009c505a_b.jpg

53844785051_2921c47b69_b.jpg

53845050318_50edf5f9e4_b.jpg
 
No idea how thick the concrete base is as well how deep they went

Rocky said the concrete piles go all the way down to bedrock along this stretch of Don Roadway to prevent it from sinking into the buried pollution there.
Final road surface level should be close to the top of the silver cylinder supports for the hydro line towers.
 
Rocky said the concrete piles go all the way down to bedrock along this stretch of Don Roadway to prevent it from sinking into the buried pollution there.
Final road surface level should be close to the top of the silver cylinder supports for the hydro line towers.
Thanks.

The road will slope from the Lake Shore to the Commissioner Bridge
 