Toronto Jack Layton Ferry Terminal and Harbour Square Park | ?m | ?s | Waterfront Toronto

I’m glad there isn’t a link. Taking the ferry makes it way more fun.

Well, like the Billy Bishop pedestrian tunnel, they wouldn't get rid of Ferry service if they built one here.

I'd certainly prefer a tunnel because I'm sure it would be a free way to access the island (I'm incredibly cheap).
 
A link doesn't make much sense. A link from Bay Street would cost a fortune to build and maintain and would be a long walk. Same with a link bypassing the airport. The only practical spot is deep in the Portland. The ferries are the cheapest, most convienent way to the islands.
 
Another $1 million for the rebuilding - from:

TE31.15

55 - 95 Lake Shore Blvd East, 33-53 Freeland Street and 2 and 15 Cooper Street

vii. prior to the issuance of the first above-grade building permit for the second phase of development (Block 4), a cash contribution to be used by the City towards the following capital improvements, all to the satisfaction of the Chief Planner and Executive Director, City Planning in consultation with the local Councillor;

A. a cash payment of $1,000,000 towards the Jack Layton Ferry Terminal redevelopment; and

B. a cash contribution currently estimated at $5,200,000 towards the: two-way conversion of Harbour Street between Yonge and York Streets; removal of the Bay Street on-ramp to the eastbound Gardiner Expressway; shortening of the Lower Jarvis off-ramp from the eastbound Gardiner Expressway; and/or re-construction of Lake Shore Boulevard East from Yonge Street to Lower Jarvis Street, all in accordance with the recommendations from the Lower Yonge Precinct Municipal Class Environmental Assessment.
 
Some progress. Underground infrastructure and gutters are installed. Framing for the paths is mostly done and cobblestones can be seen ready for installation.

F51D1513-DAB8-491D-9624-2D4A55CB42D2.jpeg
5CBF0AD1-0CE7-4F8D-96C9-C8C5314DED22.jpeg


Still, this seems like a few months away at best. None of the landscaping has started and the area closest to Queens Quay is still a messy excavation. I don’t think this will be done in time for the busy Summer season unless they significantly pick up the pace — pretty much right now.
 

Attachments

  • F51D1513-DAB8-491D-9624-2D4A55CB42D2.jpeg
    F51D1513-DAB8-491D-9624-2D4A55CB42D2.jpeg
    399.1 KB · Views: 577
  • 5CBF0AD1-0CE7-4F8D-96C9-C8C5314DED22.jpeg
    5CBF0AD1-0CE7-4F8D-96C9-C8C5314DED22.jpeg
    395.2 KB · Views: 751
Still, this seems like a few months away at best. None of the landscaping has started and the area closest to Queens Quay is still a messy excavation. I don’t think this will be done in time for the busy Summer season unless they significantly pick up the pace — pretty much right now.
You really can't (or shouldn't) do bricklaying or landscaping until the frost is all out of the ground but both can then happen pretty fast. If they start by May 1 I bet most will be done by June 1.
 
That makes sense but there seems to be a lot more work than just installing the cobblestone. The north side of the site that connects to Queens Quay is still just a messy excavation. From what I’ve seen walking by every few weeks, most of the work through the Winter concentrated on the walkway closer to the ticket booths and the Jack Layton statue.

That said, it’s worth looking back at how bad this highly visible tourist attraction was and the major improvement that it’s about to receive. I’m kind of retroactively embarrassed that tourists saw this...

rvu208a.jpg


fullsizerender-7-jpg.112855
 
  • Like
Reactions: DSC
Cobblestone laying has begun near the ticket booths.

593DC278-78E2-4AEE-AD2B-5D4EAF37C879.jpeg


Silva Cells are being installed closer to the south side of the site.

7D4CFEC0-86DD-4AB3-979A-15E5FFFA1A9B.jpeg

032C0C12-86DC-4CF9-A181-E835909F9B09.jpeg


Nothing yet done near Queens Quay.

1E8671DF-C95C-48F7-8E59-92A7038F39D9.jpeg
 

Attachments

  • 1E8671DF-C95C-48F7-8E59-92A7038F39D9.jpeg
    1E8671DF-C95C-48F7-8E59-92A7038F39D9.jpeg
    311.5 KB · Views: 519
  • 7D4CFEC0-86DD-4AB3-979A-15E5FFFA1A9B.jpeg
    7D4CFEC0-86DD-4AB3-979A-15E5FFFA1A9B.jpeg
    288.1 KB · Views: 553
  • 593DC278-78E2-4AEE-AD2B-5D4EAF37C879.jpeg
    593DC278-78E2-4AEE-AD2B-5D4EAF37C879.jpeg
    353.4 KB · Views: 505
  • 032C0C12-86DC-4CF9-A181-E835909F9B09.jpeg
    032C0C12-86DC-4CF9-A181-E835909F9B09.jpeg
    351.9 KB · Views: 532
Things are flying now. There were about a dozen guys working on different parts of the path. There's also a long tent up so that cobblestone work can be done in sun and rain. It's like they just suddenly realized that tourist season starts in a few weeks and there'll be hoards of people walking through here to get to the ferry.
 
Things are flying now. There were about a dozen guys working on different parts of the path. There's also a long tent up so that cobblestone work can be done in sun and rain. It's like they just suddenly realized that tourist season starts in a few weeks and there'll be hoards of people walking through here to get to the ferry.
so...just like every other project in this city?
 
unsurprising and very disappointing. So we will get, what, 1-2 summers with Phase 1 before phase 2 starts? why not just do it all at once?
 

Back
Top