Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

A friend who was at the food court today said that they reverted back to throwaway dishes and utensils. Can anyone confirm this?
 
A friend who was at the food court today said that they reverted back to throwaway dishes and utensils. Can anyone confirm this?
I believe some of the restaurants don't do it like McDonalds, A and W and subway to name a few. It's mainly the more upscale place that use them.
 
They should also replace the doors to the Queen Street TTC entrance on the lower level as well as they are relly hard to open and don't leave much space for someone to walk through.
Those offset, double-hinged doors are terrible; absolutely unwieldily, and not very accessibility friendly. It's almost as if they were designed by someone who wanted a door to look cool, but had never actually used on in his/her life.
 
Last edited:
Last edited:
Work has begun for the new bridge I got some pictures of the prep work today.

34520372436_4bf438c733_z_d.jpg

The old entrance has been removed and replaced with temporary doors inside of the construction hording.

34175803450_a7f8bc86d3_z_d.jpg


That have also removed a good chuck of the wall above.

34431336121_0626d5e57d_z_d.jpg

They have also started a staging area to construct the new bridge.
 
20170511_063746.jpg
 

Attachments

  • 20170511_063746.jpg
    20170511_063746.jpg
    2.4 MB · Views: 739

Back
Top