Toronto East FiftyFive | 83.21m | 24s | Lamb Dev Corp | a—A

I love the proportions of this. The planning dept felt that the podium was out of scale but i think it feels just right. It’s a shame it’s not laid brick but it’s a nice ironspot and the panels are flush and look tidy

. 073BC772-4F1F-45CD-B737-9F1ED276D2C5.jpeg07DCF092-6B07-4C24-881A-9F7D6CF4B03E.jpeg
 

Back
Top