Admiral Beez
Superstar
As they observed Ottawa’s experience, Metrolinx likely thought the O-Train was absolutely ready. But in addition to thirteen other faults, they’d not taken into account how the passengers would interact with the doors. There will be something on the Crosstown that Metrolinx has overlooked that causes a shutdown after a brief opening. This organization does not have a record of seeing the whole picture before acting.I genuinely believe that Metrolinx watched the Ottawa mess and will not open the line until it is absolutely ready. They have taken enough Ls with the delays already, and I am sure they want the opening to be a win.