Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
Yonge street looks close to reopening. Guessing 1-2 weeks?
IMG_1881.jpeg



IMG_1855.jpeg


Supports for the new bridge. How long will it take to complete this section? Looks complicated.
IMG_1899.jpeg



IMG_1897.jpeg



IMG_1898.jpeg



IMG_1900.jpeg



IMG_1880.jpeg



IMG_1905.jpeg
 
Yonge street looks close to reopening. Guessing 1-2 weeks?

I think they are going to grind and repave all of it between QQ and Front so they will, I assume, finish east side and do that and then move to west side (which has less sub-asphalt concrete repair needed). I suspect that the full street being done is at least a month away .
 
I think they are going to grind and repave all of it between QQ and Front so they will, I assume, finish east side and do that and then move to west side (which has less sub-asphalt concrete repair needed). I suspect that the full street being done is at least a month away .

I forwarded your comment as a reminder ... so they can plan/schedule work for late next month.

Toronto_Hydro_Corporation_Toronto_Hydro_is_reminding_everyone_to.jpg

Link
 
I was downtown this weekend. Took some shots of CIBC. Sorry if its a duplication of whats already been posted. This one is climbing so fast. And its going to fill in the skyline from many vantage points.
I love the saturation of these images! Great shots.

I thoroughly enjoy the composition of your last image Riseth.
 

Back
Top