Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
Today

IMG_2990.jpeg


IMG_2989.jpeg
 
Part 1 (15 attachment limit!!! This is going to be a lot.)

Steel is going up for the podium that will sit on top of the tracks.

IMG_5927.jpeg


The tower & podium.

IMG_5928.jpeg


IMG_5929.jpeg


Glass is proceeding well.

IMG_5933.jpeg


IMG_5932.jpeg


IMG_5937.jpeg


The lobby.

IMG_5934.jpeg


They’ve already put some glass for the walls in the lobby.

IMG_5935.jpeg


The glass is pretty high up now.

IMG_5941.jpeg


The windows for the bridge are almost done, just one more on the left.

IMG_5938.jpeg


The small window on the right is installed.

IMG_5938.jpeg


BONUS: 25 The Esplanade.

IMG_5930.jpeg


IMG_5931.jpeg


It’s getting pretty dense.

IMG_5939.jpeg


IMG_5940.jpeg
 

Back
Top