This is making the 6 pm news on CTV and CP24. Imagine that.
CC1105B5-49EA-4AB3-8417-CAA63EC42A2F.jpeg


Upon further inspection
6F51A2F9-6523-4E03-9723-B4F2C01A3A35.jpeg


I don’t see it either.
4327335F-D585-4DC3-9A4A-CAD60569B865.jpeg


Square rebar from 19##
11DE757B-E60F-43F0-A473-D787AD150E37.jpeg


Protecing CIBC property.
F9F6154E-3678-4F45-9748-83750CE357BD.jpeg


DSC has some pull. More water trucks on site.
2D48257A-D789-4E72-BC8B-970F5D88BF70.jpeg


A663231D-78EE-4E6F-9D8D-14925841CA64.jpeg
 

mburrrrr

Senior Member
Member Bio
Joined
Feb 9, 2010
Messages
1,229
Reaction score
16,644
I assume they are cutting the deck back to the recently poured column next weekend.
.

296409C8-9519-462D-95BE-B7F545667266.jpeg


C7363E0D-6644-4DBB-8445-4CCBBA9383B3.jpeg


It appears the west wall will come down at some point based on the new rendering
B2305BA6-D0C9-4E20-A142-568DD0AAA9FD.jpeg




37CB6900-3735-4321-849F-DC424C49859F.jpeg


27ACDC75-A480-4D42-BE14-15934A908838.jpeg


The louvers were in rough shape very soon after installation a few years back. Poor factory paint job.
FBDBB58C-6CA1-48FC-859E-C36ACA435AD3.jpeg


7EEFC123-A2F8-4057-B6CA-4E51E2A5B76B.jpeg
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,474
Reaction score
18,927
Location
St Lawrence Market Area
looks like they are about half-way through the cut back. From what I recall they will be cutting it back by 3 central support columns. Looking forward to seeing how it opens up Yonge St and makes the underpass feel a lot less like a barrier.
Don't forget they may be cutting away a section of the old bridge but they will then add a new pedestrian walkway.
 

Northern Light

Superstar
Member Bio
Joined
May 20, 2007
Messages
24,221
Reaction score
63,518
Location
Toronto/EY
Lets have an aerial look at this area to inform the discussion:

1667227699847.png


Of the ~97M noted above, roughly 78M is under the active rail corridor. So what is being removed is ~19M which appears green in the above image.

We'll have to go back and look at the bridge specs to see how wide the new bridge will be, I imagine it will be less than 19M wide, but what remains by way of an underpass, even w/o the new bridge is
substantial at about 80% of what's there now, add back a pedestrian bridge, and this will be a fairly modest reduction in length.
 
Last edited:

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,474
Reaction score
18,927
Location
St Lawrence Market Area
...so they're removing what used to be a part of something that's no longer there I gather.
The north section of the Yonge St bridge used to have rail tracks leading into the freight building just south of the Customs House - where CIBC part 2 is being built. This building was demolished and these tracks were removed many years ago.
 

Northern Light

Superstar
Member Bio
Joined
May 20, 2007
Messages
24,221
Reaction score
63,518
Location
Toronto/EY
...so they're removing what used to be a part of something that's no longer there I gather.

Correct: I have selected an aerial pic from 1989 below: (which I have marked to show what is now being removed)

1667230556391.png


The section east of this (arrow) was where the tracks met the main rail corridor.

This was removed to make way for the condo now situated here.

The section to the west served the CP Express Building which was demolished to make way for the previous GO Bus Terminal.
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
4,788
Reaction score
6,881
As I've indicated a multitude of pages back, that I used to remember some sorta parking lot thingy before GO moved in, as I used to cut through there a few times...but never had scope of the scale of what was above. So thanks for refreshing my memory of this once again. /bows
 