Toronto Birchcliff Urban Towns | 13.72m | 3s | Core Development | RAW Design

i remember visiting the sales Center before my wife was pregnant with my now 3 1/2 year old. We ended up buying from a different builder. Our house closed 2 years ago and this thing is STILL under construction? How sway?

I will say, it’s coming along nicely but a project of this size should never take this long to build.
 
Yeah, this project has definitely been a slow crawl. I remember walking by here for the first time on a snowy day in early 2020 and they started having some equipment gather on site. Guessing they might be able to finally finish this later this year in the late summer/autumn or sometime before end of year.
 
20230518_140557.jpg
 
3 1/2 years from start to prospective finish.........for a 3-storey above ground, 1 storey below ground building.

Average it out at about 10.5 months per floor.

Not a Centrecourt project. LOL
 
3 1/2 years from start to prospective finish.........for a 3-storey above ground, 1 storey below ground building.

Average it out at about 10.5 months per floor.

Not a Centrecourt project. LOL

That's BAD IMO. Glad we didn't buy here as we were interested at some point. We would have basically been closing in a recession after buying during a boom back in 2018. That is terrible for a 3 storey townhouse project.
 
How peculiar to leave this stuff sitting (or finishing at a snail's pace); deferring closing and the associated revenues does not seem like a winning strategy. Time is money.
 
I was actually interested in this project back in the day...this was like 2019 or something....STILL not finished. This is a black mark on this builder.
 

Back
Top