O origin New Member Member Bio Joined Aug 23, 2009 Messages 33 Reaction score 0 Sep 7, 2010 #31 emails are out: preview opening Sept 12th
Solaris Senior Member Member Bio Joined Jun 22, 2008 Messages 5,727 Reaction score 423 Location Toronto Nov 19, 2010 #32 Website is now live: http://www.theberwick.com/ Grand Opening to publiic on Nov 20 & 21 @ Yonge & Glebe ~ It appears this project is now a joint-venture between Andrin & The Brown Group of Companies
Website is now live: http://www.theberwick.com/ Grand Opening to publiic on Nov 20 & 21 @ Yonge & Glebe ~ It appears this project is now a joint-venture between Andrin & The Brown Group of Companies
C Carter Active Member Member Bio Joined Nov 17, 2008 Messages 128 Reaction score 1 Location Toronto Mar 6, 2012 #33 The homes on this site have also been taken down, over the past weeks.
U UrbanAffair Senior Member Member Bio Joined Nov 18, 2007 Messages 2,505 Reaction score 2,352 Location Toronto Mar 6, 2012 #34 The site looks like a logging site from northern Ontario, so many stumps and ripped up maples.
Atlantis Active Member Member Bio Joined Sep 25, 2010 Messages 630 Reaction score 149 Location Midtown Mar 7, 2012 #35 I was in the area today and took a quick walk to the site to check it out. Here's where they're at right now. The site looks so wide open without the trees and homes. And of course the wood chipper chewing through all those large tree trunks.
I was in the area today and took a quick walk to the site to check it out. Here's where they're at right now. The site looks so wide open without the trees and homes. And of course the wood chipper chewing through all those large tree trunks.
confusion Active Member Member Bio Joined May 14, 2008 Messages 782 Reaction score 47 Location Downtown Toronto Mar 21, 2012 #36 Some more shots of the newly created empty lot:
Roundabout Senior Member Member Bio Joined Jul 23, 2007 Messages 4,291 Reaction score 1,641 Jul 12, 2012 #37 From July 12th:
someMidTowner ¯\_(ツ)_/¯ Member Bio Joined Sep 2, 2011 Messages 9,333 Reaction score 15,197 Location (Former) Ward 16 Aug 1, 2012 #38 A [w]hole lot of progress:
someMidTowner ¯\_(ツ)_/¯ Member Bio Joined Sep 2, 2011 Messages 9,333 Reaction score 15,197 Location (Former) Ward 16 Sep 24, 2012 #39 Today:
someMidTowner ¯\_(ツ)_/¯ Member Bio Joined Sep 2, 2011 Messages 9,333 Reaction score 15,197 Location (Former) Ward 16 Oct 19, 2012 #40 October 19th:
Atlantis Active Member Member Bio Joined Sep 25, 2010 Messages 630 Reaction score 149 Location Midtown Dec 1, 2012 #41 Continues to make progress. Images from this afternoon: Starting to pour the fountations: Crane base is installed as well, so that one should be coming soon:
Continues to make progress. Images from this afternoon: Starting to pour the fountations: Crane base is installed as well, so that one should be coming soon:
confusion Active Member Member Bio Joined May 14, 2008 Messages 782 Reaction score 47 Location Downtown Toronto Dec 8, 2012 #42 Still no crane... Attachments WP_000600.jpg 94.4 KB · Views: 678
A adma Superstar Member Bio Joined Apr 23, 2007 Messages 17,441 Reaction score 2,030 Dec 8, 2012 #43 One thing's for certain: someone should take maximum architectural advantage of the exterior of the Canada Square parking spiral.
One thing's for certain: someone should take maximum architectural advantage of the exterior of the Canada Square parking spiral.
Philip Hayward New Member Member Bio Joined Jan 27, 2011 Messages 48 Reaction score 0 Mar 1, 2013 #44 Photos taken March 1. The crane in the background of the first photo is Allure. Attachments SDC13047.jpg 98.8 KB · Views: 686 SDC13049.jpg 95.6 KB · Views: 673 SDC13050.jpg 94.9 KB · Views: 663 SDC13051.jpg 99.2 KB · Views: 702
someMidTowner ¯\_(ツ)_/¯ Member Bio Joined Sep 2, 2011 Messages 9,333 Reaction score 15,197 Location (Former) Ward 16 Mar 18, 2013 #45 Today: