TheTigerMaster
Superstar
Damn. The building looks terrifyingly ugly from that angleAugust 10th from the 39th floor of the Sheraton.
Damn. The building looks terrifyingly ugly from that angleAugust 10th from the 39th floor of the Sheraton.
Lets not panic over an unfinished building.. let it be fully built first, or for a few months after that even. Give them a chance, as things can go wrong and maybe it truely is temporary. as we all know its not a part of the design.
Damn. The building looks terrifyingly ugly from that angle
Damn. The building looks terrifyingly ugly from that angle
To close in the building, so work can be done inside. Defective glass is used for just this purpose, and then replaced later.What would suggest it is temporary? Why would you clad three stories only to redo the whole process a short time later?
Another ugly building on the ugliest street in Toronto. Fits in perfectly.
I guess this is for the notched southeast corner.
Application: Sign Permit Status: Not Started
Location: 444 YONGE ST
TORONTO ON M5B 2H4
Ward 27: Toronto Centre-Rosedale
Application#: 13 220312 SGN 00 SP Accepted Date: Aug 14, 2013
Project: First Party New
Description: To erect and display two illuminated wall signs on the southerly and easterly elevation, in conjunction with a shopping mall. **The Shops at Aura**