Are you sure? Looks like the outside crane thing is still on the building and I drove by the building yesterday still doesn't have access to people and is all fenced up from outside.
It was taken pretty late at night, and the latest June 2023 update from Tridel does mention that they're preparing for Summer occupancy. However, it could be that the construction workers left those lights on

Screenshot 2023-07-11 at 12.14.44 PM.png
 
It was taken pretty late at night, and the latest June 2023 update from Tridel does mention that they're preparing for Summer occupancy. However, it could be that the construction workers left those lights on

View attachment 491469

Spoke to the team at Auberge and they are going to start occupancy for some units in the next week or so.
 
Added additional shots of the park in front. Slightly disappointed that it doesn't look exactly like the concept pictures (pond/water replaced by playground, and wooden trimming seating replaced by generic concrete benches) but overall still looks pretty decent. Once the planted trees take shape it should look great.

IMG_1984.jpeg
IMG_1627.jpeg
IMG_1625.jpeg
IMG_1628.jpeg
 
Part of me wishes there was billboards on these towers to cover up the windowwall...but not the digital ones. I took these from E T Seton today, and upon seeing the third tiwer going up, I had wished hypothetically that the third tower would just top out there and then. Partly to step down from the other towers, partly because these are hideous.
20230902_171526.jpg
20230902_172124.jpg
20230902_172922.jpg
20230902_172926.jpg