Towered
Superstar
About frigging time - everything takes forever in this city. That sidewalk staircase is a disaster.
Report to TTC on new (replacement) entrance to Dundas Stn on next agenda.
The new entrance will be within Atrium on Bay.
It will result in the closure of the existing outdoor staircase and a therefore more usable sidewalk width.
http://www.ttc.ca/About_the_TTC/Com.../14_Entrance_Connection_to_Dundas_Station.pdf
Cross-posted to TTC: Other Items thread
Agreed but if the building owner does not agree there really is not much the TTC can do. It would certainly have been better if the King subway entrance outside One King West had been moved inside but the building owner refused (partly because it could have affected the heritage aspects inside.)About frigging time - everything takes forever in this city. That sidewalk staircase is a disaster.
Maybe they should leave the existing stairs to help disperse the crowds or the new exit will be just as packed as the current one.
Agreed but if the building owner does not agree there really is not much the TTC can do. It would certainly have been better if the King subway entrance outside One King West had been moved inside but the building owner refused (partly because it could have affected the heritage aspects inside.)
The problem is that it's a bottleneck. The squeeze between the raised tree planters and the Spring Rolls patio further west is a bad bottleneck as well.
The new entrance will not be nearly as convenient as the existing one - it will mean going through four sets of doors, instead of none. I'm also surprised that Atrium on Bay won't be required to make an accessible route from its concourse level to the subway as part of the major renovations.
Resubmission March 22 for site -plan, only a few landscaping changes. Architectural package was not resubmitted.
I had a quick peek into the MUJI space under construction - there is a large rectangular cutout in the flooring for what would most likely be the base for an escalator. There also appears to be a 2nd floor being constructed above. I'm fairly sure that the new MUJI store will be at least 2 storeys.