Toronto Aqualuna at Bayside | 61.87m | 18s | Tridel | 3XN

I found out that the south tower is being occupied in early January with the north end following later. Taken 12 December.

IMG_2941.jpeg

IMG_2942.jpeg
IMG_2943.jpeg
 
I'm going to be a wet blanket (again) - How is this going to age? I know they worked hard on the external materials but how will those materials deal with the lake side location, weather extremes, and what maintenance will be required to sustain the exteriors?
 
Excited to see that last section of the boardwalk finishing up. Will be nice to walk along that whole stretch of the waterfront when completed.
As far as I saw on the last ariel shots, they have still work to do along the west side of Parliament Street Slip - and, eventually, the east side and further east.
 

Back
Top