Toronto 8 Gladstone | ?m | 8s | Streetcar | TACT Architecture

July 23
Only 20 still has to come down
5970673890_eda5b0232d_b.jpg


5970675004_1283322b2e_b.jpg


5970117523_7ee096bac9_b.jpg
 
I had a laugh a few days ago while shooting the site.

A dump truck was leaving the site and the ground gave way to the point the front left tire was next to the shoring pile and and the body would be damage if the try pulling the truck back.

The only way they were going to get this truck move was with the big hock.

There were 3 other dump sitting on Gladstone for loading. The day was done for them at this point.

I have a closeup shot of the wheel along with the current site.
 
Some of October 05 photos now up on site

You can see the front wheel of the dump truck pin against the shoring pile
6240455053_93aee1b524_b.jpg


6240969246_9b1c8a20e3_b.jpg


6240454579_5c7a6d5fa1_b.jpg


6240970392_00f0af0049_b.jpg
 
Looks like Streetcar Dev is turning this area into a Freedville-esque, urban micro-colony. Great stuff so far!

The mid-rise projects north of Queen by Streetcar Dev will be pound-for-pound so much better than the project southside of Queen along the railway lands. Too bad Streetcar didn't develop those rail-lands, tremendous amounts of missed opportunity there.
 
Last edited:
And the crane is scheduled to go in Monday Jan 23, starting at 8 AM. Anyone going to be in the neighbourhood over the day who might like to get some photos?!

42
 
Last edited:
By the end of July, the building will be at grade. The form work is in place for most of it now and waiting rebar and the rest of the forming.
 
June 14
These freebies need to be removed and ban
7398390882_afbaa5bf5b_b.jpg


7398395308_042a229e4e_b.jpg


X Price Choppers, new Freshco
7398409608_83611c06e1_b.jpg
 