Toronto 411 Church | 121.91m | 38s | CentreCourt | IBI Group

June 23rd


IMG_3043 copy.jpg


IMG_3045 copy.jpg
 

Attachments

  • IMG_3045 copy.jpg
    IMG_3045 copy.jpg
    2.5 MB · Views: 638
  • IMG_3043 copy.jpg
    IMG_3043 copy.jpg
    2.7 MB · Views: 644
Aug 08
The crane can go up any day now as the footings are in place for it
35671768574_b988e84ef6_b.jpg

36109814650_fa06bbe4f2_b.jpg

36369112031_fc85d37e97_b.jpg

36369116541_ece6963627_b.jpg

36459984366_6918b4df21_b.jpg

36459992056_8d0c4e50fb_b.jpg
 
They didn't go too deep. Interesting.
It should be only one floor deep with zips cars in place 1-2 cars per unit.

Until we start cutting ratio to zero to 25% of units, we are only adding to the gridlock that exist today. Then we need a transit system to move these folks and Toronto 50 years behind the time doing so.
 
Stanley is a deeper site and Centrecourt developments always seem to move at lightning speed. Core condos went up in seeming record time.
 