Toronto 411 Church | 121.91m | 38s | CentreCourt | IBI Group

Today.
IMG_3926.jpg
IMG_3927.jpg
IMG_3928.jpg
 

Attachments

  • IMG_3926.jpg
    IMG_3926.jpg
    334.9 KB · Views: 504
  • IMG_3927.jpg
    IMG_3927.jpg
    503.2 KB · Views: 503
  • IMG_3928.jpg
    IMG_3928.jpg
    410.5 KB · Views: 474
If this hasn't been proof of the ridiculous speed of Centrecourt Developments, I don't know what is. I'm sure they are cutting every corner possible to do it, but the speed is something to be commended. They were down and up to grade again in 6 months.
 
This one was only two storeys down though. So a month per floor to dig down, then a month per floor to come back up, plus some wiggle room at the beginning for shoring and site prep. They're not that much slower or faster than most projects
 
The latest from Loblaws:

DSC05301.jpg


42
 

Attachments

  • DSC05301.jpg
    DSC05301.jpg
    336.2 KB · Views: 478
Nov 3
More up on site
37483059674_d8a492118f_b.jpg

38137549226_d19232d8bf_b.jpg

38161428082_bd26743c60_b.jpg

38161424482_3b7f16587d_b.jpg

38161422462_1d6855e707_b.jpg

24340913708_8ae7972802_b.jpg

24340902418_ef25f0614f_b.jpg
 
We've changed the name of the thread, the database file, and the recent front page story to reflect that this development has had to change its name to 411 Church, as it would seem that there were legal issues with the Axis Condos moniker.

42
 

Back
Top