City Council on June 18 and 19, 2019, adopted the following:
1. City Council approve the closure of the east sidewalk and a 5.1 metre-wide portion of the westbound curb lane on Davenport Road, between a point 94 metres east of Dupont Street and a point 28 metres further east and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from June 25, 2019 to June 30, 2021.
2. City Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the north side of Davenport Road, between a point 68 metres east of Dupont Street and a point 82 metres further east, and between Bedford Road and a point 59 metres west.
3. City Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the south side of Davenport Road, between Dupont Street and a point 99 metres east, and between Bedford Road and a point 59 metres west.
4. City Council prohibit stopping at all times on the north side of Davenport Road, between a point 68 metres east of Dupont Street and a point 82 metres further east.
5. City Council prohibit stopping at all times on the north side of Davenport Road, between Bedford Road and a point 59 metres west.
6. City Council prohibit stopping at all times on the south side of Davenport Road, between Dupont Street and a point 99 metres east.
7. City Council prohibit stopping at all times on the south side of Davenport Road, between Bedford Road and a point 59 metres west.
8. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
9. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.
10. City Council direct that Davenport Road be returned to its pre-construction traffic and parking regulations when the project is complete except the parking machine space regulations.
11. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe.
12. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe.
13. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night.
14. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications.
15. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. |