Thanks for posting! I was down there the other day and saw that they are now building above ground! Very exciting! Maybe we’ll really get to move in sometime in the next 18 months!
I was told that once the third floor is built, they will be able to build one floor every three days. I’m sure that’s true but I think it’s a little unrealistic! Perhaps an entire week or two per floor seems more likely..