Moto
New Member
Was suppose to move in this december but there been an "unavoidable delay". When was your interim closing?
I have not even done PDI.
Was suppose to move in this december but there been an "unavoidable delay". When was your interim closing?
I have not even done PDI.
Wow no wonder I got delay. I assume all PDI must be done before I can move in?
I confirmed with my realtor, your assumption is not correct. As long as your PDI is done, you should get your interim closing shortly after. Completion of PDI of the whole building does not drive the individual interim closing date.
You should call concord. I got a new date for interim. I did pdi in September......
Interim closing is on the way... as soon as Nov 17th! Long wait everyone, right?
Lucky. What floor?!
My interim closing is Nov 18th, 7th floor.
Everyone happy?
Am I the only one that wasn't aware heating cost at Tango is NOT included in the maintenance fee? Instead it is part of the hydro bill, which means separate metering, and higher cost because it is electric powered?
I wasn't aware of this when I signed the contract.
Got my hydro bill, and it came yo a whopping $165.
LOL. How did you not know this?