car4041
Active Member
I love to have lrt take over the existing scarborough rt but if they have to rip station roofs, raise platforms, rip maintenance yard, insert overhead wiring, do major work on rail tunnel...as drum has stated above
Then there is no way the cost of lrt and mk2 can be the same....
To clarify, it wasn't exactly the same. The 2006 strategic plan estimated, in 2006 dollars, $421M for 4-car ICTS mk2 at a rebuilt Kennedy terminal and $554M for LRT with the same capacity. So it was a bit higher. But the LRT has other benefits, such as the fact that it works in the winter, as well as the possibility of interlining and fleet commonality with Eglinton (and let's remember that if the whole Eglinton line is built as ICTS, an extension to the airport gets much more pricey and less likely).