drum118
Superstar
September 07
Still a fair amount of work both inside and outside. This work should be done by late October.
Only haft of the class rooms ready for use and in used. Not much of a cafeteria, but a good eating area. Library area open, but still needs stuff. Starbucks is open. Computer games setup on the left hand side as you enter the north entrance.
Still a fair amount of work both inside and outside. This work should be done by late October.
Only haft of the class rooms ready for use and in used. Not much of a cafeteria, but a good eating area. Library area open, but still needs stuff. Starbucks is open. Computer games setup on the left hand side as you enter the north entrance.