^ Eglinton: if it is subway, then Phase I (15 years or whatever) needs to reach Pearson.
You can afford to delay part of Eglinton East, but not the Pearson connection. If Phase I is just Jane to Don Mills, it is inferior to Crosstown LRT in almost all respects, except the ease of further extension. But since funding for further extension is totally uncertain, nobody will take responsibility for switching from LRT to subway.
If Phase I is Pearson to Don Mills (or even to Leslie), then it will probably have enough benefits to re-consider LRT.
^ DRL: only the eastern wing is needed urgently. The western wing can be moved to 25-year plan, or even beyond.
^ BRT: Some of the proposed lines will cost a fortune. If the projections for Jane LRT jumped from 600 M to 1.2 B due to narrow right-of-way, many of those costs will apply to BRT as well. Ditto for the portion of Finch E next to Yonge (unless you use the Hydro Corridor there; and will the Hydro consent to such use on a permanent basis?).
BRT on Main south of Main Stn is physically impossible unless you knock down some buildings (and why not use Danforth Rd., as TTC themselves propose).