Dan416
Senior Member
Should we drop the Jane LRT in favour of an Albion/Weston/Keele or just Weston/Keele alignment?
I'm sorry but...what?
Should we drop the Jane LRT in favour of an Albion/Weston/Keele or just Weston/Keele alignment?
Look, I think "I'm sorry but... what?" is a lousy slogan for this group. You should change it.
I'm sorry but...what?
We'll need a North-South LRT in the west end to mirror Don Mills. No? Right now we've still got Jane on the map. And as others have suggested, Weston's got higher ridership today. So that's why I figured that corridor.
The DRL should go from Sheppard & Don Mills to Pape to Union and then to Dundas West, in my opinion. Up to Weston will be served by GO, but I wouldn't be opposed to the DRL continuing northwest to the airport or something. That western leg of the DRL is tricky given all the money being thrown at the Blue-22/GO connection.
... about 25-km of subway - that's almost the same length as the Danforth line.The DRL should go from Sheppard & Don Mills to Pape to Union and then to Dundas West, in my opinion.
... about 25-km of subway - that's almost the same length as the Danforth line.
All the way up to Sheppard is a little crazy probably. Eglinton is more realistic. Pape to downtown is the really important piece.
It won't change things massively; but I think the BRT mey be too low. Are there estimates what BRT has cost elsewhere? The Mississauga design, and Ottawa?Totals:
Subway - 55 km @ 300M/km = 16.5 billion
LRT - 34 km @ 80 M/km = 2.72 billion
BRT- 25 km @ 10 M/km = 0.25 billion
keith i have no problem with compromise, i just think LRT is best left out of the plan. things are just getting way too complicated