They were flying before winter, and in the last two weeks, there have been signs of things starting to ramp up again. Hopefully they'll be back to their frantic pace we saw last year.
Anyone know if the east bound 401 past conestoga college and coming up to the King st exit are they going to be building a flyover for people wanting to get onto the Kitchener highway 7/8.
MTO completed the environmental assessment about a decade ago as a subdivision was proposed next to the interchange and MTO wanted to make sure they protected the land they needed for the flyovers. I don't think they plan on building them any time soon.There were plans for that a long time ago already (somebody posted them way back in this thread) but nothing on the short term radar. The Grand River bridge work they're doing now is a pre-requisite for it though, so we'll have to wait a few years for that to complete and then see what the pols of the day are promising.
Anyone know if the east bound 401 past conestoga college and coming up to the King st exit are they going to be building a flyover for people wanting to get onto the Kitchener highway 7/8.
Same for 407 bridgesYes, the Steeles bridge hasn't been lengthened to allow more than 10 lanes.
You can avoid some of that backup by detouring onto Highway 409 and Highway 427 and back onto 401.It's a shame the express/ collectors setup won't be totally seamless from western Mississauga all the way to Pickering. The 401 between the 427 and Weston Rd. is always backed up. Particularly the eastbound lanes. Has there been any talk of converting this stretch of the 401 into a collectors/ express setup?