Is there a plan to rebuild the section between Strachan and Lower Jarvis on the east side? (Not sure if this question was asked previously on this thread)
Is there a plan to rebuild the section between Strachan and Lower Jarvis on the east side? (Not sure if this question was asked previously on this thread)
There is a plan to replace the girders between Grand Magazine and York Sts. The other elevated sections had girders replaced 20-30 years ago I believe and don't need replacement right now.
Or you could, y’know, take the TTC to the station.I loe when snooty redditors will say whY Don't You TAKE THe Go when I'll see at least a dozen cars with parking tickets because the lots are full!
Doesn’t help that usually a significant portion one of the lines is closed on weekendOr you could, y’know, take the TTC to the station.
I heard the next section to be worked on is Spadina but not sure if that will necessitate closing the ramp?There is a plan to replace the girders between Grand Magazine and York Sts. The other elevated sections had girders replaced 20-30 years ago I believe and don't need replacement right now.
I’m pretty sure Mimico GO station is served by buses.Doesn’t help that usually a significant portion one of the lines is closed on weekend
Doesn't help for anyone coming out of the city, plus almost all of the long branch lot is closed. Mimico is 100% full whenever something is going on downtown (sports, concert etc) I often see a dozen or more cars ticketed for parking on the street.I’m pretty sure Mimico GO station is served by buses.
Also, how busy is Mimico parking lot on the weekend?
Have you check out those buses as Noted, as I know what there now??I’m pretty sure Mimico GO station is served by buses.
Also, how busy is Mimico parking lot on the weekend?
After all lanes are rebuilt, the Gardiner will remain two lanes to allow the building of the centre barrier and that will put the full use of all lanes in service around Q2 2026. Everyone will be jumping for joy until the section of work takes place with, Oh no, not this mess again"The girder installation on the middle 2 lane reconstruction is now past the halfway mark.
Based on their pace, the middle two lanes should be done girder installation by the 2nd half of March, with another 5-6 weeks for everything else that needs done. This would make the total time for for the middle lane reconstruction ~5 months, assuming the post-girder work is about the same as the two right lanes. However, it may be even quicker since they don't need to build a barrier wall or replace lighting during this section.