Re: Photo Update
I was by last night, though without a camera, and in the dark besides.
So I will paint you a word picture.
RBC is half-excavated along its eastern edge, with the basement levels rising quickly in the excavated parts. (There are still excavation backhoes and whatnot elsewhere on site.) It's uneven, but at its highest point, it seems to be only one level below grade. The Simcoe Place loading docks traffic winds its way diagonally across the site; I understand they're waiting to get the tower up to grade so they can start excavating the other half of the site, across which said traffic currently winds.
Meanwhile, the Ritz sales centre is long gone, and two or three backhoes had scraped a crater that seemed to be six feet deep or so, which they were sitting in, side-by-side. A giant pile-drivery crane jobby is on-site, with hole-boreing attachments littered nearby.
They appear to be building skycrapers.