I can deny, and do deny.
The entire paragraph above, does not establish the last sentence, which is, in fact, a complete, total and utter fabrication.
There is no airport under construction.
There may be, one day.
Could be next month for all I know.
But its not today.
I know I need to be careful here, as ever time I bring up facts I seem to get banned.
but here goes, Some facts please let me know which ones you disagree with.
Look I don’t have a lot of time, but will try to express what I know , so if rapid fire:
I get that maybe you are not a fan of the city of Pickering aerotropolis plan but it is real and governing the direction of development, the feds hold the timing only on the airport itself and with the PASZR Influences the surrounding area.
the PASZR is not a fabrication, it is federal law that it governs and restricts the development in area in preparation for the airport.
the Veraine project is real and expects an airport, but may not be completely dependent on the airports success. Ditto for the innovation corridor.
The release of the seaton lands for development by the province, and the sign off by the region was under the condition that the developers fund the construction going on right now on the airport site to build the water and sewer lines. ( development levy).
The attempts of some to obscure this activity are noteworthy and perhaps the source of the confusion.
Specifically, We had a local MP try that “ assumed reality “ bit ( under the cover of a pandemic no less) When she misrepresented the ASA report as a passenger aviation issue. It didnt work. Personally I just think she was hoodwinked into making a mistake. That’s politics, it’s a rough game.
Next the petition she sponsored to cancel the airport failed, getting less than 1600 signatures after three months of trying out of a population of 700,000 in Durham region.
The entire region is being built and preppared around the airport, and I for one am looking forward to it. I am not alone, just ask the thousands living under Oshawa’s airports approach paths.
sure, the exact timeline is not set thanks to the pandemic but it’s not in the distance future, and phase 1 Has nothing to do with passenger aviation. Developers have already sunk $70 million into the prep and they will want their money back if the airport is canceled And What do you think happens if it is significantly delayed?
Some Developers have been trying for years to get the PASZR cancelled so they can just build more McMasions. Other developers are simply building to conform to the PASZR and planning for the opportunity ( see Veraine )
I get that some oppose this airport, got it.
but wishful thinking is not reality. Sure the federal government could cancel it tomorrow, force the region to replay the $70 million to the seaton developer, tell Veraine to stick it and release the lands to an anointed few farmers, but they havent and it dosnt look like they will. Who would Pay the political price on stopping the development of the whole region, canceling 150,000 new jobs and affordable housing for 120,000. Especially since all they need to do at this point is get out of the way.
It is ok to talk about all that, but ultimately this discussion/ topic is about the airport and the community being built around it in compliance with the airport zoning regulations. so I would suggest that pointing out the preparations underway is fair game.
If this thread is at its end, they lets move it to an aerotropolis posting.
.