News   Mar 28, 2024
 370     0 
News   Mar 28, 2024
 365     1 
News   Mar 28, 2024
 713     0 

Ottawa Transit Developments

I swear European rail manufacturers don't understand how brutal our weather is here in Canada. The winterization of vehicles seems to be subpar.
This is Ottawa's problem plain and simple, it's not representative of all of Canada.

The Confederation Line is by far the most screwed up line in the country, and it doesnt come close at this point.
 
This is Ottawa's problem plain and simple, it's not representative of all of Canada.

The Confederation Line is by far the most screwed up line in the country, and it doesnt come close at this point.

Many of the issues are due to Alstom. This is one of them. Their pantographs cant handle even a slight spring freeze. The wheel issues are another.

If you think we won't see these problems on the Finch line as well, I have some magic beans to sell you.
 
Many of the issues are due to Alstom. This is one of them. Their pantographs cant handle even a slight spring freeze. The wheel issues are another.

If you think we won't see these problems on the Finch line as well, I have some magic beans to sell you.
Should have stuck with Bombardier. But now it's the same company. How ironic
 
Should have stuck with Bombardier. But now it's the same company. How ironic
Great idea, but what decade would those cars have show up in considering all the issues with TTC and ION?? If TTC was allow to do Transit City as plan, lines would be built with no cars for them.
 
They figured it out eventually and building them in Kingston helped. I'm sure they could have squeezed them in.
Really when Kingston was doing ION and Edmonton cars? Kingston was to built 20+ cars for TTC to the point they only built 7 to handle ION and Edmonton cars.

Putting all the eggs in one basket is only asking for trouble and only have to look at TTC late deliveries and miss dates to see it.

Ottawa Line would had end up opening almost a year later than it did which was already over a year late going with BBD.

If Ford hadn't cancel Transit City in 2010, the Sheppard Line would be in place by 2014 with no cars for it. Only 2 of the 510 cars were new cars when the line open on Aug 29 when it was to be 18 in the first place.
 
Really when Kingston was doing ION and Edmonton cars? Kingston was to built 20+ cars for TTC to the point they only built 7 to handle ION and Edmonton cars.

Putting all the eggs in one basket is only asking for trouble and only have to look at TTC late deliveries and miss dates to see it.

Ottawa Line would had end up opening almost a year later than it did which was already over a year late going with BBD.

If Ford hadn't cancel Transit City in 2010, the Sheppard Line would be in place by 2014 with no cars for it. Only 2 of the 510 cars were new cars when the line open on Aug 29 when it was to be 18 in the first place.
But there is also the Quebec plant that they could have brought online.

They could have swapped the Alstom cars for Eglinton since there are no sharp curves and it's not even open yet. The Flexity cars would be better suited since they are shorter.
 
Great idea, but what decade would those cars have show up in considering all the issues with TTC and ION?? If TTC was allow to do Transit City as plan, lines would be built with no cars for them.
Also it was Metrolink going by timelines that include two lines that weren't being bult anymore. Bombardier was smart to hold off on them because there was no where for them to be delivered too unless Metrolink had some field somewhere that they wanted them delivered too. I never believed the crap that they made up to get it of the deal which ended up costing them and us more them it should have all because they were dumb and didn't have a plan at all.
 
Also it was Metrolink going by timelines that include two lines that weren't being bult anymore. Bombardier was smart to hold off on them because there was no where for them to be delivered too unless Metrolink had some field somewhere that they wanted them delivered too. I never believed the crap that they made up to get it of the deal which ended up costing them and us more them it should have all because they were dumb and didn't have a plan at all.
It's likely that if required additional cars could have been made in Kingston which would have sped up deliveries. And moving Eglinton cars to Ottawa since they have just been sitting around for two years would have given more cars quicker.

Considering that they build 200 of them for the TTC gave them experience to work out the kinks.

Hopefully the Finch cars will have been retrofitted to avoid the problems experienced in Ottawa.

However I feel that it's more of a management and maintenance issue combined with either complacency, stupidity or outright incompetence that has led to the issues they have experienced.
 
And moving Eglinton cars to Ottawa since they have just been sitting around for two years would have given more cars quicker.
Except Ottawa wasn't a Metrolinx projet and unlike with Waterloo they didn't take a deal with Metrolinx to provide the cars for them. Waterloo when they decided to take the order expected that they would get them after Toronto already had them on at least one line which would have been the Scarborough rt replacement one if city council hadn't canceled it.
 
It's likely that if required additional cars could have been made in Kingston which would have sped up deliveries. And moving Eglinton cars to Ottawa since they have just been sitting around for two years would have given more cars quicker.

Considering that they build 200 of them for the TTC gave them experience to work out the kinks.

Hopefully the Finch cars will have been retrofitted to avoid the problems experienced in Ottawa.

However I feel that it's more of a management and maintenance issue combined with either complacency, stupidity or outright incompetence that has led to the issues they have experienced.
You are missing the point.

1, Ottawa, TTC, ML and Waterloo have their own contracts, warrant and specifications as well timeline for deliveries. Same for in-service requirements.

2, How do you swap equipment when none of the buyers have the same specs, timeline, the right equipment and etc?

3. Who would be willing to swap and why?? Can you prove it?

4. What happens to warranty if swapping was to take place?? Manufactures could void the warranty as it not been used for the system who bought the cars in the first place.

What you think should have happen and what has happen doesn't play a part as to what is going on today nor in the past.
 

Back
Top