To start, I'm not entirely sure if this post is within the scope of this thread, so I can totally move it if need be. But I was reading the last few pages and I was trying to imagine what a branched/interlined Ontario Line system might look like, so I made a very very (very) rough map. Presumably you'd need to reserve 2 tracks on the Kitchener corridor to run the Ontario Line trains, so that might make this proposal dead on arrival with only 2 (?) tracks being left for GO trains, but I really have no idea what the practicality of that would be.
I should note that I've cut the Jane line back to Moss Park somewhat arbitrarily, because I figure that you don't want the most frequent portion of the system to be the joint Ontario Line/GO corridor in Leslieville with 3 services running through the stations. I also have no idea if/where any of the downtown stations will have track crossovers, though, so I'm not sure which station should be the terminus for that service. If there aren't any track crossovers, you'd probably have to rework this to either cut the Pearson line back to Union, or send the Jane line down to Union and ditch the tunnel under Roncesvalles. But this is all just rough crayoning for a very very very far-in-the-future system. Thoughts would be super appreciated!
View attachment 700049