GTS
Active Member
DRL is needed but I hope the TTC continues to keep on improving what we have. I live in Scarborough and use Victoria Park Station mostly, and Warden Station and Kennedy Station as well (not as much though). I know the VP Station isn't even complete yet but I greatly appreciate this improvement to the station already- tranferring from bus-bus, or bus to train and vise versa is much more comfortable and easy then the old seperated bus platforms at the old station. I know that Kennedy Station is getting a major treatment as well and the SRT (soon to be LRT) is coming down to the mezzanine level as well as the Eglinton Crosstown LRT- these two LRT routes already have secured funding so Kennedy is going to much, much improved soon- this is a very heavily used station, the shared bus platfoms with the indoor waiting area is well designed already and I hope it survives Kennedy Station's overhaul. I hope that Warden Station loses its seperated bus platforms as well and a common, shared platform is constructed for this station as well. It is much needed, this design makes it easier to load and unload buses, especially some older friends of mine of limited mobility. This Station Modernization Program and other funds that improve the existing system is much appreciated and I hope the TTC continues this under Karen Stintz. I think it is as important as the much needed expansion plans I have read about.