denfromoakvillemilton
Senior Member
Member Bio
- Joined
- Apr 30, 2008
- Messages
- 7,474
- Reaction score
- 1,533
- Location
- Downtown Toronto, Ontario
Is there any possibility that Metrolinx can build a new pair of tracks along the Milton corridor to resolve the issues with CP?
They are in the process of doing that. Should be done by 2021 hopefully. Will cost 1.5 billion dollars.