AlvinofDiaspar
Moderator
The angled placement is an improvement over the first gen readers installed on the turnstyles, though still inferior to placing it at the top.
AoD
AoD
The angled placement is an improvement over the first gen readers installed on the turnstyles, though still inferior to placing it at the top.
AoD
The angled placement is an improvement over the first gen readers installed on the turnstyles, though still inferior to placing it at the top.
AoD
From the article you linked.
The bus was always relatively expensive and, yet, 10 years ago carried 400,000 passengers. On a service with 40 minute frequencies.
The precipitous drop to 190k is what led to the cancellation....but the reasons cited for the drop are very interesting and, I would think, positive indicators for UPe. It was simply taking too long to get to the airport. With all of the traffic congestion and construction, their trip times had increased by 30 minutes a ride. Yes, the construction and traffic delays alone were more than the total trip time on UPe. Trip times on the bus had increased to over an hour on weekdays.
I tapped on with Presto at Dundas West this morning.
Are these units more sensitive compared to the old ones? Ive had times where it took a few tries or a couple more seconds than normal for the readers to detect my card through my wallet.
Also does anyone know when they will start installing the new gates? Are they going to phase it in after they finish doing all the stations or is it going to start at a certain batch?
Is this new? If so, glad to hear that installations are happening.
I tapped on with Presto at Dundas West this morning.
Yes. I don't think it was there yesterday morning or last week...unless I've been particularly unobservant these last few mornings.
Thanks. I wonder if the timing is related to the UPX stop opening there in a month.
I expect so. Though I wonder why they didn't prioritize this one earlier as it was already a GO connection.
I expect so. Though I wonder why they didn't prioritize this one earlier as it was already a GO connection.
I may be biased, but I wonder why Eglinton isn't on the "coming soon" list given how high ridership it is.
http://www.getpres.to/where-can-i-use-it/