Re: Union Train Shed Replacement & $600 million in GO up
^ adding to the above.
www.toronto.ca/union_stat.../intro.pdf
Components and ownership of the Station complex
The Station complex is composed of the following major elements:
• the station building (or Head House) at both ground and concourse levels;
• the moats along Front Street, turning south along both Bay and York Streets to the start of the teamways at the viaducts;
• the teamways running south from the moats along both Bay and York Streets;
• the trainshed, its platforms and tracks;
• the VIA concourse;
• the east GO concourse and planned west GO concourse; and
• the service areas directly beneath the arrival/departure hall currently used for storage, mechanical uses, parking and loading docks.
The City of Toronto owns all the lands and the building south of Front Street between York and Bay Streets north of the Canadian National Railway’s High Line, plus the York West Teamway. GO Transit owns the rail corridor roughly stretching between the Don River and Strachan Avenue, and the former CP Express site across Bay Street, including the Bay East Teamway. Between York and Bay Streets, GO Transit owns
a 27 foot high three-dimensional stratum or envelope through the City of Toronto’s property which houses the trainshed, tracks and platforms. The City of Toronto owns the building below and the air space above the GO envelope.
Several other entities have leasehold or other contractual rights to space in the Station and neighbouring properties enjoy rights of access through the block for pedestrian routes.
----
So, it appears GO owns the train shed, tracks and platform, but not the space above that, or the building (via waiting area) below.