Northern Light
Superstar
The Don River bridge near Langstaff Road is the southernmost bit of infrastructure that has a third track roughed in. From there north to Major Mac, a third track is possible, but from that point north, a third track would again require a lot of work.
Great to see the new construction roughing in the third track, but there are so many grade separations that would need to be altered to connect the roughed in bits that I don’t see this coming to fruition for decades.
I do wonder if we will see a tail track for turnbacks and layovers at Aurora or elsewhere. That would improve on the current need to deadhead south to Kirby when there are theough trains to Barrie in the mix.
- Paul
I think the bridge over Finch is large enough to support 3 tracks, is it not?
****
My overall read of the corridor is that 3 tracks look feasible (bridge replacement issues aside), south to Finch, after that the corridor tightens up a bit.