drum118
Superstar
In Europe, freight is 2nd class and only starting to meet NA standards.
The longest freight train I saw was 45 cars with most having single axial at each end compare to our duel at both ends. Then there is the coupling system that time consuming for making up or breaking a train down. Moving toward automictic couplers now. All intermodal is single level with the 1950 style open car double deck as auto racks. Height of tunnels and curves for out dated rolling stock compare NA standards. Europe is only starting to catchup with NA on various type of rolling stock that been in service for decades. We use square box frames for passenger cars while Europe use curves for double deck cars that has an impact on tall riders who sit by the window.
NA is overkill on passenger equipment and why it more costly to build and run them here compare to Europe.
Both the FRA and Transport Canada requirements for DMU, EMU and passenger equipment are dictated by the RR since they don't like passenger trains and why they kill them off decades ago. Passenger train of any type doesn't make money light freight does.
Even how we build transit projects even for GO, is over kill and not required in the first place.
The longest freight train I saw was 45 cars with most having single axial at each end compare to our duel at both ends. Then there is the coupling system that time consuming for making up or breaking a train down. Moving toward automictic couplers now. All intermodal is single level with the 1950 style open car double deck as auto racks. Height of tunnels and curves for out dated rolling stock compare NA standards. Europe is only starting to catchup with NA on various type of rolling stock that been in service for decades. We use square box frames for passenger cars while Europe use curves for double deck cars that has an impact on tall riders who sit by the window.
NA is overkill on passenger equipment and why it more costly to build and run them here compare to Europe.
Both the FRA and Transport Canada requirements for DMU, EMU and passenger equipment are dictated by the RR since they don't like passenger trains and why they kill them off decades ago. Passenger train of any type doesn't make money light freight does.
Even how we build transit projects even for GO, is over kill and not required in the first place.
Last edited: