And This is why this whole thing is completely retarded.
you cant whine and say metrolinx didnt consult with us if you ignored them 3 years ago
That's a bit much the other way.
Perhaps we could omit pejoratives slung in any direction.
It makes the conversation so much easier.
*****
In respect of the original environmental report; its huge; it covers an enormous area; 6km give or take; it was also billed as being about the rail corridor, not ravines.
I knew what it was about.
But I'm rather unusual in my interests, professional utilities, and time.
The project was there, but the Small's Creek issue was a relative after-thought in a huge project.
I can see why people missed it.
Notices didn't go out saying ' your ravine might affected'.
It would be nice if people were more curious about things and read more public documents..............
Still; some of the details are also not in the original report.
Some of the details are also.....hmmmm
Well why don't we look: (from the report)
The northern boundary of the Williamson Park ESA is immediately adjacent to the Lakeshore East Rail Corridor.The addition of a fourth track will occur north of the Williamson Park ESA; therefore, potential vegetation removalwithin this area would be associated with the extension of the existing culvert east of Coxwell (Mile 329.50 –Small’s Creek) and would be minimal and limited to within the Lakeshore East Rail Corridor. Vegetation removalproposed in areas outside of the Lakeshore East Rail Corridor, if required for the culvert modifications (i.e., stagingareas), will be kept to a minimum and will avoid the Williamson ESA
****
If you look at the cutting on the south side, I leave it to you whether or not the report gave a correct impression.
In the main body of the report there is almost no detail on the north side at all.
Though it is there..........in the appendix.